Floor Joists E11

Back

The original floor joists was infested with woodworm so the entire hallway floor was removed and replaced with new upgraded

4x2 pressure-treated floor joists.

The primeter joists were chemically-anchored with M10 bolts and a black DPC membrane was fitted between the  joists and wall to 

prevent ingress of damp to the new floor.

Concrete foundations were made on site to support the triple bolted joists beams.

The floor was finished with 18mm WBP plysheets

 

 

 

Latest News

Published: 03-03-2022
Brockley SE4
 

Brockley SE4

White MDF Loft Cupboard doors

MORE

Published: 31-03-2021
New Victoria Hospital, Kingston Upon Thames, KT2
 

New Victoria Hospital, Kingston Upon Thames, KT2

Beverage Station

MORE

Published: 22-09-2020
Sunshine Fruits Montessori Nursery Peckham SE5
 

Sunshine Fruits Montessori Nursery Peckham SE5

Custom-made Pinewood Nappy Hut

MORE

Published: 18-03-2019
 Metal partition wall  Streatham sw16
 

Metal partition wall Streatham sw16

Dividing a room into two

MORE

Published: 02-10-2018
Princess Grace Hospital, Baker St W1
 

Princess Grace Hospital, Baker St W1

MRI upgrade and refurbishment

MORE

Published: 26-03-2017
Bay Extension Mitcham CR4
 

Bay Extension Mitcham CR4

The Big Transformation

MORE

Showcase Gallery